Project Brief
MANIFAH FIELD CAUSEWAY
This project involves the construction of camps and site facilities at Manifa Field Causeway. The scope of work includes asphalt work, prefabrication, and installation of 20,000 square meter prefabricated units, which includes Aramco and JGC camps and offices, along with support facilities such as kitchen, recreation, gymnasium, and mosques. All units will be fully furnished with necessary equipment and air conditioning. The project also includes utilities such as electrical works, water network with a Reverse Osmosis Plant, pipes, pumps, tanks, sewer network, and sea water intake pumps. Other works include data and telecommunication, MATV system, plantations and irrigation system, sports facilities, and car parking shades.
Project Information
Clients:
SAUDI ARAMCO AND JGC ARABIA LTD.
Project Location:
KSA
Start Date:
Completion Date:

